DOIONLINE

DOIONLINE NO - IJMPE-IRAJ-DOIONLNE-3240

Publish In
International Journal of Mechanical and Production Engineering (IJMPE)-IJMPE
Journal Home
Volume Issue
Issue
Volume-3, Issue-11  ( Nov, 2015 )
Paper Title
Calculating Quantity Of Steel Bar Placed In Mesh Form In A Circular Slab Or Dome
Author Name
Karam Chand Gupta
Affilition
Chandigarh University
Pages
12-13
Abstract
When steel reinforcement is placed in mesh form in circular concrete slab at base or domes at top in case of over head service reservoir or any other structure, it is difficult to estimate/measure the total quantity of steel that would be needed or placed. For the purpose of calculating the total length of the steel bars, at present, the practice is – the length of each bar is measured and then added up. This is tiresome and time consuming process. I have derived a mathematics formula with the help of which we can calculate in one line the quantity of total steel that will be needed. This will not only make it easy and time saving but also avoids any error in making entries and calculations.
  View Paper