Publish In |
International Journal of Mechanical and Production Engineering (IJMPE)-IJMPE |
Journal Home Volume Issue |
||||||||
Issue |
Volume-3,Issue-7 ( Jul, 2015 ) | |||||||||
Paper Title |
Improving The Energy Efficiency Of Central Air Conditioning Var Plant By Identification And Possible Tapping Of Unutilized Capacity Of Auxiliary Systems | |||||||||
Author Name |
Sanjay Pramanathan.S, Santhosh Kumar.P.M,Panneerselvam.S, Sandeep.S, Ragan Reghunath, K.Indran | |||||||||
Affilition |
Student BE mechanical engineering , Sri Muthukumarn Institute of Technology , Assistant Professor Sri Muthukumarn Institute of Technology, Maintenance Engineer, CPCL, Manali, Chennai | |||||||||
Pages |
1-5 | |||||||||
Abstract |
The main objective of the project is to reduce the energy consumption and additional costs related to the centralized air conditioning system used in the Captive Power Plant. One of main aims of this project is to suggest a cost effective modification which would result in a quicker payback to the company for its investment in the modification. As the motto of the project is energy and resource conservation, the modification we suggest does not include any new power source or technologies introduced to improve the efficiency, instead, using the already existing technologies and resources effectively to the maximum. Keywords- VAR-Vapour Absorption Refrigeration, Air-conditioning, energy, layout modification, conservation, Fouling factor, captive power plant | |||||||||
View Paper |