DOIONLINE

DOIONLINE NO - IJMPE-IRAJ-DOIONLNE-2614

Publish In
International Journal of Mechanical and Production Engineering (IJMPE)-IJMPE
Journal Home
Volume Issue
Issue
Volume-3,Issue-7  ( Jul, 2015 )
Paper Title
Improving The Energy Efficiency Of Central Air Conditioning Var Plant By Identification And Possible Tapping Of Unutilized Capacity Of Auxiliary Systems
Author Name
Sanjay Pramanathan.S, Santhosh Kumar.P.M,Panneerselvam.S, Sandeep.S, Ragan Reghunath, K.Indran
Affilition
Student BE mechanical engineering , Sri Muthukumarn Institute of Technology , Assistant Professor Sri Muthukumarn Institute of Technology, Maintenance Engineer, CPCL, Manali, Chennai
Pages
1-5
Abstract
The main objective of the project is to reduce the energy consumption and additional costs related to the centralized air conditioning system used in the Captive Power Plant. One of main aims of this project is to suggest a cost effective modification which would result in a quicker payback to the company for its investment in the modification. As the motto of the project is energy and resource conservation, the modification we suggest does not include any new power source or technologies introduced to improve the efficiency, instead, using the already existing technologies and resources effectively to the maximum. Keywords- VAR-Vapour Absorption Refrigeration, Air-conditioning, energy, layout modification, conservation, Fouling factor, captive power plant
  View Paper